Sequence II – Cost and schematic design are still under development. The desire is to begin this portion of the project in the summer of 2024. Unity’s Trustees would determine a timeline as fundraising would need to match the costs.
The desired multi-purpose space which will support fine arts and physical education, will include a theater stage attached to a gymnasium resulting in a multi-functional space. The physical education and fine arts programs will have designated space that can be used concurrently. The dramatic and fine arts programs will now have a dedicated space for practice and performances.
- New band/orchestra classroom supporting Unity’s two bands and two orchestras.
- Restructuring of current space to create a physical education area, wrestling practice space, and support other co-curricular activities.
- Additional bathroom and locker facilities
- On site development office
- New student entrance adding increased commons area allowing students to gather before, during and after school. This will also provide a community entrance and gathering area when hosting fine arts performances and community activities.